Sunday, 12 July 2015

Day 6: Barnoldswick to Burnley.

Sunday 12 July.

We stayed at the Fountain in in Barnoldswick. It had excellent food, but as a result it was busy and a bit noisy. Even so, with an early breakfast we were on the road by ten past nine. 

A short distance from the hotel we passed a gentleman taking his dogs for a walk. I asked if I could share their photo with you and he agreed.

From Barnoldswick to the Foulridge tunnel there are no locks and the water is at the highest level it will reach on the journey from Leeds to Liverpool. There are some interesting bridges however, with vertical rollers at the side, which were needed in the days of horse drawn barges. They were needed to reduce friction on ropes when bridges were located near bends in the canal. At Foulridge the canal passes through a tunnel and walkers must make a small detour to find the west portal of the tunnel. We became a little geograhically challenged at this point but did eventually find our way, through a lot of new housing, and skirted the Foulridge reservoir to reach the west portal of the tunnel. We think the reservoir is used to feed the canal system.

The first locks we encountered were a flight at Barrowford, some very near where the canal ran under the motorway.
After the motorway, the section of the canal between Barrowford and Nelson became a bit more urban  and untidy but the canals environ became greener again as we approached Burnley. 

We had another first today when we encountered 4 geese and a gosling on the towpath. We thought this surpring until we rounded the next bend to find approximately 30 geese on the towpath. Is someone feeding them up for Christmas?

 I was surprised how clean Burnley appeared, from our elevated view on the canal, and it was clear that old areas were still being demolished and redeveloped. 
We passed a busy pub, the 'Inn on the Wharf,' just as the canal turned west to skirt the south of the town. There were lots of bits of old canal machinery and industrial buildings in the area. Within a mile we had crossed the M65 by the canal and found our hotel for the night. The Holiday Inn Express. We walked back a mile to the 'Inn on the Wharf' for our evening meal. Food was good and prices reasonable.

Saturday, 11 July 2015

Day 5: Gargrave to Barnoldswick.

Saturday 11 July.

Our earliest start of the walk today. It was warm with some cloud as we joined the canal, on a comparatively short walk to Barnoldswick. The idea was to get to our B&B (pub.) around 2 pm so Frau Barr could watch the tennis from Wimbledon.

After the previous 'canal day', with no locks all the way to Gargave, we passed 3 locks in quick succession today. We also had a short sharp shower of rain, for which we donned waterproofs, but within 10 minutes we were taking them off again. 

We were walking  cross country and for a while the towpath ran with the Pennine Way. I had seen the double arched bridge twice previously on PW walks.


We also met up with the Pendle Way for a while.
Just before Barnoldswick we stopped at a small tea rooms, Lock Stop, to have tea and scones. They also had a good selection of homemade cakes. We were joined by two red robins that obviously knew the place well. We have no red robins in NZ so it was good to see one again. We also saw a pair of swans, this time with only 8 cygnets. Still a pretty good score! Shortly afterwards we entered Barnoldwick with some very well maintained gardens beside the canal. Some others not so good.



Friday, 10 July 2015

Settle to Gargrave.

Friday 10 July.

We left our B&B at 9:36am on a warm and sunny morning. We passed an interesting church on our left with a side turret off the main tower. Must go back and revisit sometime. The town was packed with motor vehicles and the roads were very busy. They spoilt the appearance of what is probably a nice small country town.

 There was a flowerpot festival in progress, similar to the scarecrow festival I saw when I was walking JOGLE. I've included pictures of 3 of the displays  I saw to give you an idea.I particularly like the 'Shaun the Sheep.' 


We took a short steep hill, 1in 5, out of Settle. The road was narrow and quite busy.You can see the view back to Settle below.
This road crosses the Pennine Bridleway.  Shortly afterwards we turned off to the right (south), first onto a walled lane, which then downgraded to a simple path. The first photo shows a view to the side of  path, note the dry stone wall. The next shows the path itself.
Shortly before Otterburn we walked through a small forest where we saw two chaps fitting chains to a vehicle with rubber tyres. Compare what you see here to those you fit to go skiing!!!!
From Otterburn we took the road to Bell Busk. It was hot and near lunch time so we stopped to snack on nuts and half a Mars bar. We also took off our socks and aired our feet. 
From Bell Busk we first followed a walled track towards Gargrave, We could have taken it all the way to Gargrave but it was a little longer than a path we chose, which ran just to the south of it. They eventually joined up where the walled path was also the Pennine Way, just outside Gargrave. On the early part of the track a few signs had been broken or disfigured but sineage was better nearer Gargrave. Note the useful seat beside the Pennine Way. We nearly missed it, it was so well concealed..
We are now back on the Leeds to Liverpool Canal.

Thursday, 9 July 2015

Horton-in-Ribblesdale to Settle.

Thursday 9 July.

We left our B&B, Horton Villa, and set off south, down the main road, past The Golden Lion. We took a minor road, that forked off left, which then became a path down to a small bridge over the river Ribble. After crossing the bridge we were then on the Ribble Way, heading south. We took a final shot of Pen-y-ghent, with its clasic profile.

 On reaching Helwith Bridge we went wrong when trying to find a short path to the minor road running south down the Ribble Valley, to the west of the river. We finished up at a flooded quarry, now a fishing lake, and had to back track. We eventually found the road and went up it, from where we took a last photographs back towards Horton. Note the change in profile of Pen-y-ghent from this view point.
.
Looking south, toward Stainforth, we got the view below.

We turned down from the road into Stainforth where we had lunch at the Craven Heifer and a great view over the Ribble. We chose to take the main road down to Langcliffe, as there was a pavement, but the road was too busy and noisy. We'd advise taking the path up from the LHS of the road. Just before Langcliffe we found a quiet path, on the RHS of the road down to the Ribble with a great view back above Stainforth.
We then found a bridge across the Ribble, near a weir, and continued to Settle on the Ribble Way. It has it's own symbol, an R over a W. The condition of the path deteriorated significantly near some playing fields on the outskirts of Settle as can be seen below.
The penultimate picture is a view north, up the Ribble, from the bridge entering Settle. The final picture was also taken from that location, Bill, Ben, and my sister - Weed.

Wednesday, 8 July 2015

Up and around Pen-y-ghent.

Wednesday 8 July.

Today we first had a look around the old Norman church at Horton before setting out on our climb. The weather was sunny but Pen-y-ghent was shrouded in low cloud. (NB. The church photograph below was taken at 5.30pm after the weather cleared. Pen-y-ghent is visible in the background.)


I
The view looking back to Horton-in-Ribblesdale, note the low cloud, which we entered as we climbed higher.

Shiel having a rest on the way up. Note the angle of the dry stone wall. It is quite a steep climb. 
The picture below was taken looking up towards the summit. Two people, one in red, can just be seen heading down. The poor visibility had some benefits.Shiel and I suffer from vertigo but were OK as we couldn't see how far the fall was.
We eventually reached the trig. point on the summit and here are the pictures to prove it! There is a very effective summit shelter. It was very, very windy today. Strangely the wind was not as fierce at the summit as it was where we first met the Pennine Way.There the wind was frighteningly strong.

On the way down we met a group of people with a woman in an all terrain vehicle. She said it was designed to give disabled people access to areas they wouuld not normally be able to visit. She was really excited and enjoying ever minute of the adventure.